Vessel Mobilisation
We engineered and built a complete cable-lay spread and mobilised it onboard our client's vessel, the MV Blue Sky, at our quayside in Jebel Ali.
The spread included a 3,500 T carousel, a loading tower, a 10 T tracked tensioner, cable ways and a cable chute, everything needed to turn the vessel into a working cable-laying platform, ready for offshore operations.
In March 2023 our company successfully executed an EPIC contract for our client covering the delivery of advanced cable handling and storage systems in support of subsea cable operations.
The scope of work included the engineering construction and commissioning of two high capacity carousels with nominal capacities of 3,000 T and 3,500 T respectively. In addition loading towers and tensioner systems were designed and integrated to ensure controlled and efficient cable handling throughout the operation.
As part of the project we also delivered a complete storage spread and lay spread enabling safe and reliable transpooling of subsea cables from the cable laying vessel to the shore based storage system. Particular attention was given to operational reliability safety and interface management between vessel equipment and shore facilities.
The project was executed in accordance with strict HSE requirements and industry standards demonstrating our capability to manage complex cable logistics and heavy offshore equipment within an integrated EPIC framework. This project reflects our hands on approach technical expertise and commitment to delivering practical solutions for demanding offshore cable installation projects.
Carousels · Offshore · ATEX
In the first quarter of 2021 we delivered a high-capacity carousel system for an offshore cable-laying project. We designed and built a demountable carousel available in 2,500 T, 5,000 T and 7,000 T configurations, giving the flexibility to match different cable loads and operations.
We also supplied a loading tower with a 5 T tensioner, all made at our facility in Dubai. The final delivery was a DNV-certified 7,000 T carousel with its loading tower and 5 T tensioner, built to fully comply with ATEX Zone 2 safety standards.
From engineering and fabrication through certification and delivery, this project shows we can supply certified, high-capacity cable handling equipment that meets strict offshore and hazardous-area safety requirements.