SCA — Project
1 × 400 T and 2 × 700 T Carousels with Loading Towers & Tensioners 2025 Carousels · Offshore

1 × 400 T and 2 × 700 T Carousels with Loading Towers & Tensioners 2025

We designed, manufactured and assembled a set of cable-handling carousels made up of one 400 T and two 700 T offshore units. The mix of sizes was chosen to give our client flexibility across a range of cable-laying jobs.

Each carousel comes with its own loading tower and a 3 T tower tensioner for careful cable handling, backed up by 5 T deck tensioners to keep everything stable and in sync during offshore work.

Together the units form a modular spread that scales up or down depending on the project, whether that's a mid-sized campaign or a heavier installation, while keeping cable handling safe and controlled throughout.

Scope of work

  • Design
  • Manufacturing
  • Full assembly
  • Loading tower integration
  • Tensioner supply

Key specifications

  • Carousel: 1 × 400 T
  • Carousels: 2 × 700 T
  • Loading towers: one per unit
  • Tower tensioners: 3 T
  • Deck tensioners: 5 T
  • Delivered: 2025
Project photos
magnifiercrosschevron-downchevron-right