2023
SCA — Project
Mobilisation 3,500 T Carousel 2023 Carousels · Mobilisation

Mobilisation 3,500 T Carousel 2023

In 2023 we mobilised a 3,500 T carousel onto a cable-lay barge. To save time, we prepared the carousel so it could be lifted onboard in two separate lifts rather than one.

The first lift placed the base frame, and the second set the cable basket on top. Splitting it this way cut the mobilisation time noticeably and kept the operation straightforward and safe.

Scope of work

  • Two-lift mobilisation
  • Base frame lift
  • Cable basket lift
  • On-site execution

Key specifications

  • Carousel: 3,500 T
  • Onto: cable-lay barge
  • Method: two-lift mobilisation
  • Delivered: 2023
Project video
The mobilization involved preparing a 3,500t carousel such it could be lifted onboard the cable lay barge in 2 lifts. First lift involved the base frame and the second lift the cable basket. This approach significantly reduced the mobilization time.