Carousels · Offshore · ATEX
In the first quarter of 2021 we delivered a high-capacity carousel system for an offshore cable-laying project. We designed and built a demountable carousel available in 2,500 T, 5,000 T and 7,000 T configurations, giving the flexibility to match different cable loads and operations.
We also supplied a loading tower with a 5 T tensioner, all made at our facility in Dubai. The final delivery was a DNV-certified 7,000 T carousel with its loading tower and 5 T tensioner, built to fully comply with ATEX Zone 2 safety standards.
From engineering and fabrication through certification and delivery, this project shows we can supply certified, high-capacity cable handling equipment that meets strict offshore and hazardous-area safety requirements.